Home ProductsCompact 200 bailey bridge

multispan steel bridge in China

multispan steel bridge in China

Product Details:

Place of Origin: Jiangsu, China (Mainland)
Brand Name: zhongye
Certification: IOS9001
Model Number: Q345B

Payment & Shipping Terms:

Minimum Order Quantity: 1 Set/Sets
Price: US $ 1,000 - 1,500 / Ton
Packaging Details: by container
Delivery Time: 15 working days after prepayment
Payment Terms: L/C,T/T
Supply Ability: 2600 Ton/Tons per Month
Contact Now
Detailed Product Description
ONE SPAN OF 2 SPANS: 33 LOAD CAPACITY: 55t

Specifications

 

1 Less expense, wide usage 
2 for other supporting use 
3 Send engineers to guide labor 
4 Factory direct export 
 

 

 

Bailey Bridge requires no special tools or heavy equipment for construction, the bridge elements are small enough to be carried in , and the bridge is strong enough to carry . It is considered a great example of military engineering.

Bailey Bridge requires no special tools or heavy equipment for construction, the bridge elements are small enough to be carried in , and the bridge is strong enough to carry . It is considered a great example of military engineering.

The compact 200 panel bridge: The compact 200 panel bridge is similar to the compact 100 panel bridge from their appearance. The difference is its increased panel height to 2.134m. It employed the method of alternating joints between Reinforcement Chords and the joints between panels. This method can decrease inelastic deformation caused by the oversized pinholes.  Pre-arch method is used to additionally cut down mid-span and vertical deflection to a larger degree. Bolt-connected components use the orienting sleeve- fixing method to increase accuracy of connections. Shear is created in orienting sleeves and tension is developed in bolts, which increase the usage life of the bolts and ensure the safety of panel bridges. Wind resistant brace is made to be composite type and is connected to transom/girders to improve overall stability of panel bridges.

The part between braced frame and panels is fixed through bridging so as to prevent the whole bridge from side bending. After the erection, there will be a pre-arched degree over the span of the bridge. Besides it can be assembled into single-lane bridges. The compact 200 panel bridge can also be assembled into double lane bridge, hence it broadens its application range. It is suitable for the load designs of HS-15, HS-20, HS-25 and pedrail-50 etc.

 

Span Construction-Load Table ---  Extra Single Lane (W=4200mm)    Span Construction-Load Table ---Double Lane (W=7350mm)
  SPAN-ft HS-15 HS-20 HS-25       SPAN-ft HS-15 HS-20 HS-25
30 SS SS SS   30 SS SS SS
40 SS SS SS   40 SS SS SS
50 SS SS SS   50 SS SS SSR
60 SS SS SS   60 SS SSR SSR
70 SS SS SSR   70 SSR SSR DS
80 SS SSR SSR   80 SSR DS DSR1
90 SSR SSR SSR   90 SSRH DSR1 DSR2H
100 SSR SSR SSR   100 DSR1 DSR2H TSR2
110 SSR SSR DS   110 DSR1 DSR2 QS
120 SSR DS DSR1   120 TS DSR2H TSR2
130 DS DSR1 DSR2H   130 DSR2H TSR2 TSR3
140 DSR1 DSR2H DSR3H   140 TSR2 TSR3 TSR3H
150 TSTSR2 DSR2H DSR4H   150 TSR3H TSR3H QSR4
160 DSR2H DSR2H TSR2   160 QSR4 QSR4 QSR4
170 TSR2 TSR2 TSR3   170 QSR4 QSR4  
180 TSR2 TSR3 TSR3H   180 QSR4    
190 TSR3H TSR3 QSR4          
200 QSR4 TSR3QSR3  QSR4          

Remark:

1.SS shows one range one tier; DS shows two ranges one tier; TS shows three ranges one tier; DD shows two range two tiers etc. 

2.If R follows SS, DS, DD, etc, means reinforce type,and R1 means only one range reinforced, R2 means two ranges reinforced

 

 

   

Contact Details
Zhenjiang Sunrise Mechanical & Electrical Equipment Co.,Ltd.

Contact Person: Ms. shannoie

Tel: +86-159-51400966

Fax: +86-511-85483646

Send your inquiry directly to us (0 / 3000)