Jiangsu Zhongye Traffic Engineering Co.,Ltd.

Quality first, integrity-based
Sales & Support 0086-136-55280991
Select Language
English
Russian
中文
Home Products Compact 200 bailey bridge

beley bridge erecting

Contact Us

Ms. shannoie Tel:0086-136-55280991

Address: zhenjiang city ,jiangsu province

Email: info@jszybridge.com; shannoie@gmail.com;

Certifications
Quality Compact 200 bailey bridge for sale
I am Online Chat Now
Ms. shannoie() Ms. shannoie()

beley bridge erecting

1
beley bridge erecting
Product Details:
Place of Origin: Jiangsu, China (Mainland)
Brand Name: zhongye
Model Number: Q345B
Certification: IOS9001
Payment & Shipping Terms:
Price: US $ 600 - 1,600 / Unit
Packaging Details: 40ft container
Delivery Time: 15 working days after prepayment
Payment Terms: T/T,L/C
Supply Ability: 2500 Ton/Tons per Year
Minimum Order Quantity: 1 Unit/Units
Description

Specifications

 

1.military structed
2.conveniently-transported
3.rapid erection/easy assembled/fast installed
4 huge load

 

5.Long service life

6.Strong corrosin resistance

Bailey Bridge is a standard bridge equipment, adopted extensively and the most popular in the world,

possessing thefeatures of simple structure, convenient transport, speedy erection and easy disassembling,

while having theadvantage of heavy loading capacity, great stability and long fatigue life being capable of an alternative span,

loadingcapacity and mixture form to erect all kinds of Temporary Bridges, Emergency Bridges and Fixed Bridges.

Using thebridge equipment, the suspension bridges of varied span can be erected.

The bridge has the advantages of fewcomponents, light weight and low cost.

Bailey bridge is similarly like compact 100,compact 200 International bridge.

Itis assembled by each 3m panel, and invented by Donald Bailey.

The 321 panel bridge can be easily dissembled andrapidly erected.

The whole bridge is made by hightensile strength steel.

Main beam is light weight panels and thepanels are connected by panel connection pins.

It is easy to assemble or disassemble and transport.

It can also beassembled into different forms of panel bridges according to their span length and transportation requirement.

Soithas been widely applied as emergency transportation, temprary or permanent bridge.

Its suitable load design is suchlike HS-15, HS-20, HS-25 and pedrail-50 etc.

 

Goverment of Nigeria and our company assist bridges to Nigeria.

Company representatives and goverment members of Nigeria in the completion ceremony.

Chinese ambassador and president of Togo presented in the ribbon-cutting ceremony of our bridge construction.

This bridge is deck type. Length:60m. Width:4.5m. Loading:150ton.

beley bridge erecting

 

beley bridge erecting

 

 

beley bridge erecting

 

 

 

 

 

 

 

Other about
Contact Us
Ms. shannoie
  • zhenjiang city ,jiangsu province
  • Tel:0086-136-55280991
  • Fax:0511--85585215
From:
Enter your Email ID please.
Send your inquiry directly to us
(685/3000)