TSR ZB 200 BAILEY BRIDGE

    • TSR ZB 200  BAILEY BRIDGE
    • TSR ZB 200  BAILEY BRIDGE
    • TSR ZB 200  BAILEY BRIDGE
  • TSR ZB 200  BAILEY BRIDGE

    Product Details:

    Place of Origin: CHINA
    Brand Name: Sunrise
    Certification: ISO9001
    Model Number: ZB200/COMPACT200/HD200

    Payment & Shipping Terms:

    Minimum Order Quantity: 1SET
    Price: 1600USD
    Packaging Details: NULL
    Delivery Time: 15 working days after prepayment
    Payment Terms: T/T,L/C, Western Union, MoneyGram
    Supply Ability: 2600 Ton/Tons per Month
    Contact Now
    Detailed Product Description

    ZB 200 panel bridge: ZB 200 panel bridge is similar to the compact 100 panel bridge from their appearance. The difference is its increased panel height to 2.134m. It employed the method of alternating joints between Reinforcement Chords and the joints between panels. This method can decrease inelastic deformation caused by the oversized pinholes. Pre-arch method is used to additionally cut down mid-span and vertical deflection to a larger degree. Bolt-connected components use the orienting sleeve- fixing method to increase accuracy of connections. Shear is created in orienting sleeves and tension is developed in bolts, which increase the usage life of the bolts and ensure the safety of panel bridges. Wind resistant brace is made to be composite type and is connected to transom/girders to improve overall stability of panel bridges.
    The part between braced frame and panels is fixed through bridging so as to prevent the whole bridge from side bending. After the erection, there will be a pre-arched degree over the span of the bridge. Besides it can be assembled into single-lane bridges. The compact 200 panel bridge can also be assembled into double lane bridge, hence it broadens its application range. It is suitable for the load designs of HS-15, HS-20, HS-25 and pedrail-50 etc.

    Span Construction-Load Table ---Extra Single Lane (W=4200mm)

    SPAN-ft

    HS-15

    HS-20

    HS-25

    30

    SS

    SS

    SS

    40

    SS

    SS

    SS

    50

    SS

    SS

    SS

    60

    SS

    SS

    SSR

    70

    SS

    SS

    SSR

    80

    SS

    SSR

    SSR

    90

    SSR

    SSR

    SSR

    100

    SSR

    SSR

    SSR

    110

    SSR

    SSR

    DS

    120

    SSR

    DS

    DSR1

    130

    DS

    DSR1

    DSR2H

    140

    DSR1

    DSR2H

    DSR3H

    150

    TSTSR2

    DSR2H

    DSR4H

    160

    DSR2H

    DSR2H

    TSR2

    170

    TSR2

    TSR2

    TSR3

    180

    TSR2

    TSR3

    TSR3H

    190

    TSR3H

    TSR3

    QSR4

    200

    QSR4

    TSR3/QSR4

    QSR4

     

     

     

     

     

     

     

     

     

     

     

     

     

         
           

     

     

     

     

     

     

     

     

    Span Construction-Load Table ---Double Lane (W=7350mm)

    SPAN-ft

    HS-15

    HS-20

    HS-25

    30

    SS

    SS

    SS

    40

    SS

    SS

    SS

    50

    SS

    SS

    SSR

    60

    SS

    SSR

    SSR

    70

    SSR

    SSR

    DS

    80

    SSR

    DS

    DSR1

    90

    SSRH

    DSR1

    DSR2H

    100

    DSR1

    DSR2H

    TSR2

    110

    DSR1

    DSR2

    QS

    120

    TS

    DSR2H

    TSR2

    130

    DSR2H

    TSR2

    TSR3

    140

    TSR2

    TSR3

    TSR3H

    150

    TSR3H

    TSR3H

    QSR4

    160

    QSR4

    QSR4

    QSR4

    170

    QSR4

    QSR4

     

    180

    QSR4

       
           

    1.SS shows one range one tier; DS shows two ranges one tier; TS shows three ranges one tier; DD shows two range two tiers etc.

    2.If R follows SS, DS, DD, etc, means reinforce type,and R1 means only one range reinforced, R2 means two ranges reinforced etc.

    3.one ft  =0.3048 m;

     

    Services Division specialises in the installation, refurbishment, maintenance and decommissioning of structural steelwork, providing a cradle-to-grave approach to the management of our customers’ steelwork assets.

    The Division provides our customers with the onsite expertise and support to ensure effective delivery of major infrastructure projects, employing approved safety systems and specialist techniques to facilitate the safe and efficient erection and installation of steelwork.

    Delivering a turnkey solution to all construction sites, we have a dedicated team able to provide management of complex projects and in emergency situations.  The service is highly comprehensive and includes maintenance and repair of existing bridges and other steelwork assets, as well as the management (installation and removal) of all necessary temporary works to ensure sites are left in a safe state on completion of the project.

    Backed up with the highest levels of health and safety performance, demonstrated through our industry-leading accident frequency rate and safety performance accreditations, our team of highly experienced site managers provide a wide range of services to new and existing road, rail, energy and infrastructure projects.

    ·         Bridge Installation

    ·         Structural Steelwork Installation

    ·         Bridge Strengthening and Refurbishment, including Heat Straightening and Structural Refurbishment

    ·         Steelwork Maintenance

    ·         Temporary Works

    ·         Surface Protective Treatment including Grit Blasting, Painting and Encapsulation

    ·         Specialist Advice, including Site Estimating, Bridge Inspections and Emergency Incidents

    TSR ZB 200  BAILEY BRIDGE

     

     

    Tag:

    ZB200,

    panel,

    bridge

    Contact Details
    Zhenjiang Sunrise Mechanical & Electrical Equipment Co.,Ltd.

    Contact Person: Ms. shannoie

    Tel: +86-159-51400966

    Fax: +86-511-85483646

    Send your inquiry directly to us (0 / 3000)